The role of emotional intelligence on the outcome of negotiation in construction procurement / (Record no. 6183)

MARC details
000 -LEADER
fixed length control field 02427ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000091248
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113305.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 150915t2014 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001514(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271034
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201712041044
Level of effort used to assign classification fateeha
-- 201509151634
-- asma
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD39.5 .L44 2014 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Lee, Wai Khwan
245 14 - TITLE STATEMENT
Title The role of emotional intelligence on the outcome of negotiation in construction procurement /
Statement of responsibility, etc. Lee Wai Khwan
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 63 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 47-51
520 3# - SUMMARY, ETC.
Summary, etc. Negotiation is a process that involves the interaction of emotion. In the other word, Emotion has significant impact in manipulate the result of negotiation. Both of these elements are relevant to each other indirectly. The interesting facts inspire the thought to create this research. This research was conducted to recognize the effect of the dimensions of Emotional Intelligence (EI) on the outcome of negotiation in construction procurement. There are two main objectives in this study, to identify the dimension of EI that affects the outcome of negotiation in construction procurement conflict and to determine the component of EI that has the greatest influential to the outcome of negotiation in construction procurement conflict. Sets of questionnaires were distributed and data was collected by mail and walk-in. Based on feedbacks from the respondents, most of them are aware about the importance of EI in negotiation. The result from the analysis shown that, the four dimensions of EI is identified as factor which can affects the outcome of negotiation in construction procurement conflict. Lastly, the result of comparison of average mean between all dimensions shown relationship management is the main factors which influencing the outcome of negotiation in construction procurement conflict
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial procurement
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Emotional intelligence
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/18805">http://ecollib.ump.edu.my/id/eprint/18805</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD39.5 .L44 2014 r Bc. 0000100697 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8993 | HD39.5 .L44 2014 r Bc. 0000100698 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us