MARC details
| 000 -LEADER |
| fixed length control field |
02262nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000029672 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204346.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
080625s2007 my f 001 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003407(Local) |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003408(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905141144 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201107132026 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
201006110943 |
| Level of effort used to assign classification |
ida |
| Level of effort used to assign subject headings |
200908141452 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200806251533 |
| -- |
fara |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TG315 .I45 2007 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Ili Sarah Embong |
| 245 13 - TITLE STATEMENT |
| Title |
An effective bridge asset management at Peninsular Malaysia / |
| Statement of responsibility, etc. |
Ili Sarah Embong |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2007 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xvi, 93 p. : |
| Other physical details |
col. ill. ; |
| Dimensions |
30 cm. |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Currently, many state transportation system are reaching the end of their service lives due to larger vehicles and increased truck traffic volumes, which can often speed the destruction of bridges and highways. Bridge asset management has been embraced by other Department of Transportation. In the late year 1990, the Texas Department of Transportation (TxDOT) formed two sections to perform bridge management within its bridge division. There are field operations and project development. A Bridge Management System typically estimates two types of costs. There are improvement and agency. Improvement costs are estimated to determine the cost of a maintenance action to improve the condition of an element. The expected user cost savings for safety and serviceability improvements should also be estimated. In Malaysia, the asset management for bridge is not applied yet to all bridges in Malaysia. It was just focus on the big bridge. An effective asset management strategy centers on many key aspects there are treatment strategies, deterioration modeling, cost modeling, future cost and life cycle cost analysis, bridge inspection, budget planning and prioritization, use of Geographic Information System (GIS), training, emergency management planning, and rehabilitation and retrofitting. -Author |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Bridge construction industry |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Bridges |
| General subdivision |
Maintenance and repair |