An effective bridge asset management at Peninsular Malaysia / Ili Sarah Embong

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2007Description: xvi, 93 p. : col. ill. ; 30 cmISBN:
  • THE0003407(Local)
  • THE0003408(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 Abstract: Currently, many state transportation system are reaching the end of their service lives due to larger vehicles and increased truck traffic volumes, which can often speed the destruction of bridges and highways. Bridge asset management has been embraced by other Department of Transportation. In the late year 1990, the Texas Department of Transportation (TxDOT) formed two sections to perform bridge management within its bridge division. There are field operations and project development. A Bridge Management System typically estimates two types of costs. There are improvement and agency. Improvement costs are estimated to determine the cost of a maintenance action to improve the condition of an element. The expected user cost savings for safety and serviceability improvements should also be estimated. In Malaysia, the asset management for bridge is not applied yet to all bridges in Malaysia. It was just focus on the big bridge. An effective asset management strategy centers on many key aspects there are treatment strategies, deterioration modeling, cost modeling, future cost and life cycle cost analysis, bridge inspection, budget planning and prioritization, use of Geographic Information System (GIS), training, emergency management planning, and rehabilitation and retrofitting. -Author
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Notes Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG TG315 .I45 2007 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000030328
Final Year Report Final Year Report UMPLIB GAMBANG TG315 .I45 2007 rs Bc. (Browse shelf(Opens below)) 2 Not for loan c.2 0000044542

Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007

Currently, many state transportation system are reaching the end of their service lives due to larger vehicles and increased truck traffic volumes, which can often speed the destruction of bridges and highways. Bridge asset management has been embraced by other Department of Transportation. In the late year 1990, the Texas Department of Transportation (TxDOT) formed two sections to perform bridge management within its bridge division. There are field operations and project development. A Bridge Management System typically estimates two types of costs. There are improvement and agency. Improvement costs are estimated to determine the cost of a maintenance action to improve the condition of an element. The expected user cost savings for safety and serviceability improvements should also be estimated. In Malaysia, the asset management for bridge is not applied yet to all bridges in Malaysia. It was just focus on the big bridge. An effective asset management strategy centers on many key aspects there are treatment strategies, deterioration modeling, cost modeling, future cost and life cycle cost analysis, bridge inspection, budget planning and prioritization, use of Geographic Information System (GIS), training, emergency management planning, and rehabilitation and retrofitting. -Author

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us