MARC details
| 000 -LEADER |
| fixed length control field |
02254nam a2200241 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000029310 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204347.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
080606t2007 my f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003479(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905151155 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201211021556 |
| Level of effort used to assign classification |
Fida |
| Level of effort used to assign subject headings |
201107132028 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
200908141455 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200806061020 |
| -- |
training |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH438.15 .M64 2007 rs Thesis |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Mokhzani Mokhtar |
| 245 10 - TITLE STATEMENT |
| Title |
Primavera project planner and Microsoft project in handling cost planning, a case study at Terengganu Indoor Stadium / |
| Statement of responsibility, etc. |
Mohd Mokhzaini bin Mokhtar |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2007 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xv, 102 p. : |
| Other physical details |
ill.(some col.) ; |
| Dimensions |
30 cm. |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Planning before construction undertakes is considered as a must nowadays due to the fact that many mishaps could be avoided especially delays in project handover. This study focused on cost planning regarding manpower resources. In Malaysia, the labour pricing are highly various for different location and not as averaging as its counterpart. With the advent of technology, planning tools like Microsoft Project and Primavera Project Planner - which the paper use is highly dependable in assisting planning development. Base on several analyses done, it is found that cost planning requires several factors to be considered in their planning development. Such factors are like monetary factors, labour productivity, and general overhead, contingencies, and profit. As the paper found, Primavera is without doubt, very essential in dealing with complex project planning, whilst its counterpart, Microsoft Project is very user friendly thus suitable for normal to moderate project complexity. In the end, it is concluded that, it depends of the project weight itself in order to choose the suitable planning tools. Suggestion for future research is that, both machinery and material factor should be considered to enhance the paper end result. -Author |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Building |
| General subdivision |
Estimates |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction industry |
| General subdivision |
Cost control |