MARC details
| 000 -LEADER |
| fixed length control field |
01881nam a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098283 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113328.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161206t2016 my a f 001 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000095(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905131326 |
| Level of effort used to assign nonsubject heading access points |
aishah |
| Level of effort used to assign subject headings |
201712181607 |
| Level of effort used to assign classification |
saini |
| Level of effort used to assign subject headings |
201612061102 |
| Level of effort used to assign classification |
safura |
| -- |
201612061024 |
| -- |
safura |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FIM .S93 2016 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nurul Syakirah Binti Mohd Ali |
| 245 12 - TITLE STATEMENT |
| Title |
A study to identify the factor that causes project delay in construction at Terengganu / |
| Statement of responsibility, etc. |
Nurul Syakirah Binti Mohd Ali |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2016 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
x, 46 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm.+ |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography |
| 520 2# - SUMMARY, ETC. |
| Summary, etc. |
This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster. |
| 610 2# - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Industrial Management |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/4160">http://ecollib.ump.edu.my/id/eprint/4160</a> |
| Public note |
Access in library only |