A study to identify the factor that causes project delay in construction at Terengganu / Nurul Syakirah Binti Mohd Ali

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2016Description: x, 46 p. : ill. (some col.) ; 30 cm.+ 1 CD-ROMISBN:
  • THE0000095(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016 Scope and content: This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FIM .S93 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115578
Final Year Report Final Year Report UMPLIB GAMBANG CD 10354 | FIM .S93 2016 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115579

Faculty of Industrial Management

Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016

Bibliography

This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.