MARC details
| 000 -LEADER |
| fixed length control field |
01918ntm a2200289 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000098326 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113336.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
161207t2015 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000038(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905131126 |
| Level of effort used to assign nonsubject heading access points |
aishah |
| Level of effort used to assign subject headings |
201712061240 |
| Level of effort used to assign classification |
nazri |
| -- |
201612071424 |
| -- |
fateeha |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FIM .F385 2015 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nur Fatihah Zakeri |
| 245 14 - TITLE STATEMENT |
| Title |
The causes and effect of delay to handover the project in construction industry / |
| Statement of responsibility, etc. |
Nur Fatihah Zakeri |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2015 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 70 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2015 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 49-51 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Industrial Management |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/4188/">http://ecollib.ump.edu.my/4188/</a> |
| Public note |
Access in library only |