The causes and effect of delay to handover the project in construction industry / Nur Fatihah Zakeri

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2015Description: xii, 70 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000038(Local)
Subject(s): Online resources: Dissertation note: Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2015 Abstract: This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FIM .F385 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115634
Final Year Report Final Year Report UMPLIB GAMBANG CD 10382 | FIM .F385 2015 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000115635

Faculty of Industrial Management

Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2015

Bibliography : p. 49-51

This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us