Variation of contract price determination in design and build method / (Record no. 710)

MARC details
000 -LEADER
fixed length control field 01859nam a2200229 a 4500
001 - CONTROL NUMBER
control field vtls000029388
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204348.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 080611t2007 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001547(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271059
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201211021612
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201107132034
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 200908141505
Level of effort used to assign classification VLOAD
-- 200806111041
-- fara
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD2365 .A35 2007 rs Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmadian Majidi @ Baha
245 10 - TITLE STATEMENT
Title Variation of contract price determination in design and build method /
Statement of responsibility, etc. Ahmadian bin Majidi @ Baha
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2007
300 ## - PHYSICAL DESCRIPTION
Extent xviii, 106 p. ;
Dimensions 30 cm.
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3# - SUMMARY, ETC.
Summary, etc. Nowadays, construction industry in Malaysia move rapidly equivalence with economic growth. Expanding of the construction industry, reveal usage of construction project delivery method. One of construction delivery method rapidly usage is Design and Build method. In this study, there are 30 respondents have been selected from around Malaysia that help out to identify problems always occur in Design and Build method. Besides that, the study also has been made on usage variation of Design and Build method among selected construction agencies. Within usage of the variation method, there are a few factors and criteria need to be considered in selection of the variation method as construction project delivery method. After that, the study continues on identifying usage type's determination of contract price which exist in construction. However the contract price usage has a few criteria as guidance in selection of the contract price method for a construction project. -Author
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Contracting out
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD2365 .A35 2007 rs Thesis 0000030393 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us