MARC details
| 000 -LEADER |
| fixed length control field |
02156ntm a2200277 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000102639 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113352.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
171227s2017 my da f am 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0000689(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905170955 |
| Level of effort used to assign nonsubject heading access points |
nazirah |
| -- |
201712271229 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .S537 2017 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Sharmaine Shaari |
| 245 10 - TITLE STATEMENT |
| Title |
Traffic management during construction : |
| Remainder of title |
case study of flyover at Jalan Bukit Ubi, Kuantan / |
| Statement of responsibility, etc. |
Sharmaine Shaari |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2017 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 79 p. : |
| Other physical details |
ill. (some col.), charts ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 59-61 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |