Traffic management during construction : case study of flyover at Jalan Bukit Ubi, Kuantan / Sharmaine Shaari

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2017Description: xiii, 79 p. : ill. (some col.), charts ; 30 cm. + 1 CD-ROMISBN:
  • THE0000689(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 Abstract: Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .S537 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000120828
Final Year Report Final Year Report UMPLIB GAMBANG CD 10960 | FKASA .S537 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000120829

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017

Bibliography : p. 59-61

Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us