Analysis of rice inventory problem at Padiberas National Berhad (BERNAS) in order to improve its performance by using simulation software / (Record no. 8724)

MARC details
000 -LEADER
fixed length control field 03277ntm a2200325 a 4500
001 - CONTROL NUMBER
control field vtls000098472
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113436.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161214s2016 my da f am 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005436(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151515
Level of effort used to assign nonsubject heading access points hanafiah
Level of effort used to assign subject headings 201712081544
Level of effort used to assign classification saini
Level of effort used to assign subject headings 201708161553
Level of effort used to assign classification saini
-- 201612141446
-- saini
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKP .Y37 2016 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Yap, Fui Yin
245 10 - TITLE STATEMENT
Title Analysis of rice inventory problem at Padiberas National Berhad (BERNAS) in order to improve its performance by using simulation software /
Statement of responsibility, etc. Yap Fui Yin
246 30 - VARYING FORM OF TITLE
Title proper/short title Analysis of rice inventory problem at Padiberas National Berhad (BERNAS) in order to improve its performance by using simulation software
Medium [electronic resource]
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 78 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD ROM
500 ## - GENERAL NOTE
General note Faculty of Manufacturing Engineering
500 ## - GENERAL NOTE
General note Theses Gred A
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 67
520 3# - SUMMARY, ETC.
Summary, etc. Inventory is one of the seven wastes of lean manufacturing. Rice is considering as perishable product, it just can keep in warehouse for 4-6 months in proper condition. This research was conducted at KBB Kuala Rompin. The high processing of the paddy into rice cause the high volume of packaged rice store at rice warehouse. The slow moving of the rice shipping out of the rice warehouse cause the high inventory level of rice in the rice warehouse. The existing condition of the rice inventory performance has been analyzed. The improvement for the rice inventory level at rice warehouse will be propose to KBB Kuala Rompin by using simulation software. The company profile, company history and production data through interview with plant manager, time study and manual book have been collected for analysis purpose. Promodel software is used to simulate the current performance of the rice inventory and do the improvement. The methods that used to analyze the causes of the high rice inventory level were Ishikawa diagram, 5Whys and 5W1H. The problem of excessive rice in rice warehouse can be solved by increase the lorry arrival time from 1 lorry per 1.5days to 2 lorries per day. Hence if there have demand of the 80MT rice in a day; the percentage of the rice inventory is decrease from 15.26% to 0.01% which nearly reached 0% inventory level. The fast moving of the rice from the rice warehouse to customer can provide win-win situation between buyer and KBB Kuala Rompin. Since the rice inventory level decrease to zero inventory, they can utilize the huge space of rice warehouse to do the other usage. After knowing the causes that leads to high inventory level, then the solution for improvements will be proposed to KBB Kuala Rompin.
538 ## - SYSTEM DETAILS NOTE
System details note Item in PDF format
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Manufacturing Engineering
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/25998">http://ecollib.ump.edu.my/id/eprint/25998</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 10460 | FKP .Y37 2016 r Bc. 0000115975 04/09/2019 1 04/09/2019 Restricted Collection
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   FKP .Y37 2016 r Bc. 0000119221 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us