Material takeoff in building information modelling (BIM) for architecture component building / (Record no. 8744)

MARC details
000 -LEADER
fixed length control field 02771ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000098255
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113437.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 161205t2016 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007857(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201906131110
Level of effort used to assign nonsubject heading access points nazri
Level of effort used to assign subject headings 201712121105
Level of effort used to assign classification fateeha
-- 201612051035
-- fateeha
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .I99 2016 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohd Izzul Filzi Hassan
245 10 - TITLE STATEMENT
Title Material takeoff in building information modelling (BIM) for architecture component building /
Statement of responsibility, etc. Mohd Izzul Filzi Hassan
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 62 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 59-62
520 3# - SUMMARY, ETC.
Summary, etc. This thesis seeks to develop an understanding of Building Information Modelling in the construction management industry specifically in estimating through the use of Autodesk Quantity Takeoff. The goal is to provide students with a guide into how to accurately and efficiently perform a quantity takeoff and turning that takeoff into an estimate. An overview to what estimators do and the types of projects they work on was analysed. A comparison between how estimators manually perform quantity takeoffs and using Building Information Modelling to perform quantity takeoffs was performed. A sample from Revit Architecture and Structure was used as the model for the quantity takeoff. An overview of using the building information modelling model to perform a full quantity takeoff was first performed. A subsequent quantity takeoff was then performed using manual takeoff techniques. As we know that accurate materials takeoff is the vital key for cost estimation so that proper cost estimation coordination can be conducted. Using manual materials takeoff, estimator also must imagine and visualize based on 2D drawing for the construction sequence so that material takeoff can be conducted. By using BIM approaches, all the possible error due to human error and miscalculation problem can be minimized. BIM tools also came with capabilities for extracting building component and generated materials takeoff schedule. In this study, researcher, conducting cost estimation based on Revit Organization from the virtual 3D architecture model.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/25588">http://ecollib.ump.edu.my/id/eprint/25588</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .I99 2016 r Bc. 0000114939 04/09/2019 1 04/09/2019 Final Year Report
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 10194 | FKASA .I99 2016 r Bc. 0000114940 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us