Material takeoff in building information modelling (BIM) for architecture component building / Mohd Izzul Filzi Hassan

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2016Description: xiv, 62 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0007857(Local)
Subject(s): Online resources: Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016 Abstract: This thesis seeks to develop an understanding of Building Information Modelling in the construction management industry specifically in estimating through the use of Autodesk Quantity Takeoff. The goal is to provide students with a guide into how to accurately and efficiently perform a quantity takeoff and turning that takeoff into an estimate. An overview to what estimators do and the types of projects they work on was analysed. A comparison between how estimators manually perform quantity takeoffs and using Building Information Modelling to perform quantity takeoffs was performed. A sample from Revit Architecture and Structure was used as the model for the quantity takeoff. An overview of using the building information modelling model to perform a full quantity takeoff was first performed. A subsequent quantity takeoff was then performed using manual takeoff techniques. As we know that accurate materials takeoff is the vital key for cost estimation so that proper cost estimation coordination can be conducted. Using manual materials takeoff, estimator also must imagine and visualize based on 2D drawing for the construction sequence so that material takeoff can be conducted. By using BIM approaches, all the possible error due to human error and miscalculation problem can be minimized. BIM tools also came with capabilities for extracting building component and generated materials takeoff schedule. In this study, researcher, conducting cost estimation based on Revit Organization from the virtual 3D architecture model.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG Reference FKASA .I99 2016 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000114939
Final Year Report Final Year Report UMPLIB GAMBANG Reference CD 10194 | FKASA .I99 2016 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000114940

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016

Bibliography : p. 59-62

This thesis seeks to develop an understanding of Building Information Modelling in the construction management industry specifically in estimating through the use of Autodesk Quantity Takeoff. The goal is to provide students with a guide into how to accurately and efficiently perform a quantity takeoff and turning that takeoff into an estimate. An overview to what estimators do and the types of projects they work on was analysed. A comparison between how estimators manually perform quantity takeoffs and using Building Information Modelling to perform quantity takeoffs was performed. A sample from Revit Architecture and Structure was used as the model for the quantity takeoff. An overview of using the building information modelling model to perform a full quantity takeoff was first performed. A subsequent quantity takeoff was then performed using manual takeoff techniques. As we know that accurate materials takeoff is the vital key for cost estimation so that proper cost estimation coordination can be conducted. Using manual materials takeoff, estimator also must imagine and visualize based on 2D drawing for the construction sequence so that material takeoff can be conducted. By using BIM approaches, all the possible error due to human error and miscalculation problem can be minimized. BIM tools also came with capabilities for extracting building component and generated materials takeoff schedule. In this study, researcher, conducting cost estimation based on Revit Organization from the virtual 3D architecture model.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us