MARC details
| 000 -LEADER |
| fixed length control field |
02566ntm a2200277 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000102656 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113437.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
180104s2017 my da f am 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007891(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201906131122 |
| Level of effort used to assign nonsubject heading access points |
nazri |
| -- |
201801041042 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .S933 2017 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Syawal Mohammad |
| 245 10 - TITLE STATEMENT |
| Title |
3D-BIM mechanical model updates for construction of MBKT Tower project / |
| Statement of responsibility, etc. |
Mohd Syawal Mohammad |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2017 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 51 p. : |
| Other physical details |
ill. (some col.), charts ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 51 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Building Information Modeling (BIM) is one of the most affirming developments in the architecture, engineering and construction (AEC) industries. With BIM technology, an accurate virtual model of a building is constructed digitally. BIM can be used in all discipline involved in construction which are architecture, structure, mechanical, electrical and plumbing. This research will focus on mechanical discipline which is for heating, ventilation and air conditioning (HVAC) system. Many contractors and companies still use 2D drawings and are starting to realize a 3D modelling can save time and money. Construction by using conventional method or 2D drawing uses many separate documents to explain a building while BIM assembles all information into one location. It is a centralized database model. Besides that, BIM-3D model provides better visualization of a building in term of management and planning compared to conventional 2D drawing. A case study was adopted from an administration building project in Kuala Terengganu. The aim of this study is to explore the BIM model based approach by developing HVAC system model, and comparing BIM method with conventional method. The process of developing the model was done by using Autodesk AutoCAD and Autodesk Revit software. By using this BIM based model approach, researcher believe that it will helps construction project teams for better project coordination, management and planning in the future construction. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |