MARC details
| 000 -LEADER |
| fixed length control field |
02593ntm a2200277 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000102627 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113438.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
171226s2017 my da f am 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007879(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201906131117 |
| Level of effort used to assign nonsubject heading access points |
nazri |
| -- |
201712261428 |
| -- |
saini |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .Q77 2017 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nur Qurratu’ain Rusman |
| 245 10 - TITLE STATEMENT |
| Title |
3D-BIM electrical model updates for construction of MBKT Tower project / |
| Statement of responsibility, etc. |
Nur Qurratu’ain Rusman |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2017 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
x, 61 p. : |
| Other physical details |
ill. (some col.), charts ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 47-48 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
During early stage of design and construction phase, there are some potential that conflicts may arise between building components. Problem occur about clashes of Electrical elements with other elements in construction such as Architectural elements, Structural elements, Plumbing items and etc. Revise 2D drawing by using traditional method have poor visualization and make it difficult to make design changes and the changes need to be done in every views. Within the last decade, building information modelling (BIM) has emerged as a potential solution to these problems. BIM allow the designers to view the building and its contents from all angles, and revealing problems at earlier stages to allow for correction without costly change orders. Electrical BIM Services allow the developing highly precise 3D Electrical coordinated models that aid to reduce conflicts and provide better 3D visualization and walkthrough of electrical design. This research will only focusing on 3D Model updates of electrical components in MBKT Tower in Terengganu. Research method that been used in this study is extracted electrical building component information about its measurement and takeoff by using Revit Suite 2015 software. This research are basically based on the case study and all data that was collected from real construction project. By using this BIM model approach, researcher believe that it will helps construction project teams for better project coordination in the coming years. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and Colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |