Factors that contribute to delay in construction project in Johor / (Record no. 92428)

MARC details
000 -LEADER
fixed length control field 02980ntm a2200373 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125105544.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200701t20192019my a|||fram|| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0008684(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .M56 2019 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mimi Ereena Solahudin Alayubi,
Relator term author.
245 10 - TITLE STATEMENT
Title Factors that contribute to delay in construction project in Johor /
Statement of responsibility, etc. Mimi Ereena Solahudin Alayubi
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2019
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2019
300 ## - PHYSICAL DESCRIPTION
Extent x, 74 pages :
Other physical details illustrations ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction project. The research was focus on study the causes of delay in construction project based on contractor-related, consultant-related, client-related categories in Johor, Malaysia. The scope of the research is mainly focus on literature review and a questionnaire survey. The questionnaire survey was designed based on the causes of construction delays, effects of construction delays and the methods of minimizing the construction delays. The respondent involved in this research is contractor, consultant, and client. Through the literature review, 11 factors were selected for contractor related, 8 factors were selected for consultant related and 7 factors were selected for client related. A set of questionnaire were prepared which consist of three sections. Out of 150 respondent targeted only 104 respondent had completely answered the survey that had been distributed by hand, e-mail and link using online survey. The data was analysed using Average Index method and each factor was ranked. From the data analysis, delay in approving major changes of work by consultant is the highest average index that contribute to the causes of delay with average index value is 4.221 under the scale ‘Agree’. For method to minimize delay in construction project, most of the respondent agree on effective strategic planning which has the highest value of average index which is 4.462.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Final Year Report
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 01/07/2020   FKASA .M56 2019 r Bc. T000000665 12/10/2020 1 01/07/2020 Final Year Report
  Not lost Library of Congress Classification     Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 01/07/2020   CD12561 T000000666 17/11/2020 1 01/07/2020 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us