Risk assessment of public road construction projects using analytical hierarchy process (AHP) / (Record no. 92555)

MARC details
000 -LEADER
fixed length control field 02813ntm a2200373 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125105551.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200709t20192019my a|||fram|| 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0008721(Local)
Qualifying information hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .A343 2019 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Putri Aifa Syuhaida Shabuddin,
Relator term author.
245 10 - TITLE STATEMENT
Title Risk assessment of public road construction projects using analytical hierarchy process (AHP) /
Statement of responsibility, etc. Putri Aifa Syuhaida Shabuddin
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMP,
Date of production, publication, distribution, manufacture, or copyright notice 2019
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2019
300 ## - PHYSICAL DESCRIPTION
Extent xi, 59 pages :
Other physical details illustrations (some color) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
337 ## - MEDIA TYPE
Media type term computer
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
338 ## - CARRIER TYPE
Carrier type term computer disc
Source rdacarrier
347 ## - DIGITAL FILE CHARACTERISTICS
File type text file
Encoding format PDF
Source rda
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of risk to occur which places the road construction project at risk of cost, time overruns and poor quality delivery. The aim of this study was to analyze the risk assessment of public road construction projects. The factors and sub-factors of risk in public road construction project were scrutinized from the literature review. The designate pair-wise questionnaire survey was distributed to the road engineering section of public work department, road contractors and road concessionaires in accordance with the Analytic Hierarchy Process (AHP). This study identified the most prioritized risk factors as follows: economic and financial (0.267), technical (0.165), organizational (0.148), contractual (0.130), natural hazard (0.125), socio and politic (0.086) and resources (0.079). The risk sub-factors were also ranked and the top five sub-factors were determined as follows: flood (0.633), inflation risk (0.561), changes in government law and regulation (0.543), lack coordination between parties (0.467), fund risk (0.439). It is expected that the data presented in this study can be used to strategically select elements for risk monitoring on the prioritization risk.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Disertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Final Year Report
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG Reference 09/07/2020   FKASA .A343 2019 r Bc. T000000731 14/04/2022 1 09/07/2020 Final Year Report
  Not lost Library of Congress Classification   In Transit Reference UMPLIB GAMBANG UMPLIB GAMBANG   09/07/2020   CD12593 T000000732 09/07/2020 1 09/07/2020 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us