Risk assessment of public road construction projects using analytical hierarchy process (AHP) / Putri Aifa Syuhaida Shabuddin

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2019Copyright date: © 2019Description: xi, 59 pages : illustrations (some color) ; 30 cm. + 1 CD-ROMContent type:
  • text
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0008721(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 Abstract: Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of risk to occur which places the road construction project at risk of cost, time overruns and poor quality delivery. The aim of this study was to analyze the risk assessment of public road construction projects. The factors and sub-factors of risk in public road construction project were scrutinized from the literature review. The designate pair-wise questionnaire survey was distributed to the road engineering section of public work department, road contractors and road concessionaires in accordance with the Analytic Hierarchy Process (AHP). This study identified the most prioritized risk factors as follows: economic and financial (0.267), technical (0.165), organizational (0.148), contractual (0.130), natural hazard (0.125), socio and politic (0.086) and resources (0.079). The risk sub-factors were also ranked and the top five sub-factors were determined as follows: flood (0.633), inflation risk (0.561), changes in government law and regulation (0.543), lack coordination between parties (0.467), fund risk (0.439). It is expected that the data presented in this study can be used to strategically select elements for risk monitoring on the prioritization risk.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG Reference Reference FKASA .A343 2019 r Bc. (Browse shelf(Opens below)) 1 Not for loan T000000731
Final Year Report Final Year Report UMPLIB GAMBANG Reference CD12593 (Browse shelf(Opens below)) 1 In Transit T000000732

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019

Includes bibliographical references

Highways or road construction project are one of the public infrastructure project that are important for social economic development. Due to this reason Malaysia government paying much more attention to these projects. Even though appropriate measurement taken, there is still great probability of risk to occur which places the road construction project at risk of cost, time overruns and poor quality delivery. The aim of this study was to analyze the risk assessment of public road construction projects. The factors and sub-factors of risk in public road construction project were scrutinized from the literature review. The designate pair-wise questionnaire survey was distributed to the road engineering section of public work department, road contractors and road concessionaires in accordance with the Analytic Hierarchy Process (AHP). This study identified the most prioritized risk factors as follows: economic and financial (0.267), technical (0.165), organizational (0.148), contractual (0.130), natural hazard (0.125), socio and politic (0.086) and resources (0.079). The risk sub-factors were also ranked and the top five sub-factors were determined as follows: flood (0.633), inflation risk (0.561), changes in government law and regulation (0.543), lack coordination between parties (0.467), fund risk (0.439). It is expected that the data presented in this study can be used to strategically select elements for risk monitoring on the prioritization risk.