MARC details
| 000 -LEADER |
| fixed length control field |
02428ntm a2200373 i 4500 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
MY-KuUP |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251125105807.0 |
| 006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS |
| fixed length control field |
t||||fr|||| 000 0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
| fixed length control field |
ta |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
201111t2 2 m a|||fram|| 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0008977(Local) |
| Qualifying information |
hardback |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| Language of cataloging |
eng |
| Transcribing agency |
UMP |
| Description conventions |
rda |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
FKASA .A854 2019 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Ahmad Atif Adzman, |
| Relator term |
author. |
| 245 10 - TITLE STATEMENT |
| Title |
Strategies to measure progress and productivity in model-based construction projects / |
| Statement of responsibility, etc. |
Ahmad Atif Adzman |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Kuantan, Pahang : |
| Name of producer, publisher, distributor, manufacturer |
UMP, |
| Date of production, publication, distribution, manufacture, or copyright notice |
2019 |
| 264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Date of production, publication, distribution, manufacture, or copyright notice |
© 2019 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
x, 39 pages : |
| Other physical details |
illustrations (some color) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 336 ## - CONTENT TYPE |
| Content type term |
text |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media type term |
unmediated |
| Source |
rdamedia |
| 337 ## - MEDIA TYPE |
| Media type term |
computer |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier type term |
volume |
| Source |
rdacarrier |
| 338 ## - CARRIER TYPE |
| Carrier type term |
computer disc |
| Source |
rdacarrier |
| 347 ## - DIGITAL FILE CHARACTERISTICS |
| File type |
text file |
| Encoding format |
PDF |
| Source |
rda |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Includes bibliographical references |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
These days more construction projects arise and to ensure the efficiency of these projects, precise construction progress measurement is needed. Current manual progress and productivity tracking are very time consuming and have a high possibility for error to occur. As we are advancing towards modern construction projects, we require tools and techniques in ensuring accurate progress measurement. Nowadays we have model-based technologies to assist in measuring those progress. However, current literature does not provide with proper strategies on how to benefit the model in measuring progress nor productivity. This study explores the current and potential strategies to measure progress using model-based technology. Qualitative data from individual interviews with industry practitioners that have experienced with model-based construction projects were analysed. It can be said most of the companies in construction industry prefer the real-time construction simulation. The findings of the study will add to the current literature by providing the strategy of progress measurement in model-based construction. |
| 610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME |
| Corporate name or jurisdiction name as entry element |
Faculty of Civil Engineering and Earth Resources |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Universities and colleges |
| General subdivision |
Dissertations |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Theses |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Final Year Report |