Strategies to measure progress and productivity in model-based construction projects / Ahmad Atif Adzman

By: Material type: TextTextPublisher: Kuantan, Pahang : UMP, 2019Copyright date: © 2019Description: x, 39 pages : illustrations (some color) ; 30 cm. + 1 CD-ROMContent type:
  • text
  • text
Media type:
  • unmediated
  • computer
Carrier type:
  • volume
  • computer disc
ISBN:
  • THE0008977(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 Abstract: These days more construction projects arise and to ensure the efficiency of these projects, precise construction progress measurement is needed. Current manual progress and productivity tracking are very time consuming and have a high possibility for error to occur. As we are advancing towards modern construction projects, we require tools and techniques in ensuring accurate progress measurement. Nowadays we have model-based technologies to assist in measuring those progress. However, current literature does not provide with proper strategies on how to benefit the model in measuring progress nor productivity. This study explores the current and potential strategies to measure progress using model-based technology. Qualitative data from individual interviews with industry practitioners that have experienced with model-based construction projects were analysed. It can be said most of the companies in construction industry prefer the real-time construction simulation. The findings of the study will add to the current literature by providing the strategy of progress measurement in model-based construction.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG Reference FKASA .A854 2019 r Bc. (Browse shelf(Opens below)) 1 Not for loan T000001235
Final Year Report Final Year Report UMPLIB GAMBANG Reference CD12803 (Browse shelf(Opens below)) 1 Not for loan T000001236

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019

Includes bibliographical references

These days more construction projects arise and to ensure the efficiency of these projects, precise construction progress measurement is needed. Current manual progress and productivity tracking are very time consuming and have a high possibility for error to occur. As we are advancing towards modern construction projects, we require tools and techniques in ensuring accurate progress measurement. Nowadays we have model-based technologies to assist in measuring those progress. However, current literature does not provide with proper strategies on how to benefit the model in measuring progress nor productivity. This study explores the current and potential strategies to measure progress using model-based technology. Qualitative data from individual interviews with industry practitioners that have experienced with model-based construction projects were analysed. It can be said most of the companies in construction industry prefer the real-time construction simulation. The findings of the study will add to the current literature by providing the strategy of progress measurement in model-based construction.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us