Lean manufacturing implementation for low volume car production / Shuhairy Said

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2008Description: 45 p. : ill. (some col.) ; 30 cm. + 1 computer discISBN:
  • THE0007491(Local)
Other title:
  • Lean manufacturing implementation for low volume car production [electronic resource]
Subject(s): Dissertation note: Project paper (Bachelor of Mechanical Engineering with Automotive) -- Universiti Malaysia Pahang - 2008 Abstract: The purpose of this project is to analyze the implementing of the lean methodology to low volume car production. There are many problem occurs at the production line such as breakdown of the machine. The project has started with identifying problem at the AMM plant focus at the Trim and Finale Department. Then, the data has been analyzed by using Total Quality Management Tools such as fishbone diagram and Pareto chart. From the analysis, the main problem is come from two type of the machine which is the mount lift and overhead pulley. The losses will affect the losses to the company. Some lean tools are suggested to overcome the problems which are Total Productive Maintenance (TPM), Standardized Work, Continuous Improvement, 5S and others. There are the advantages of applying lean methodology to the car production such as increase worker’s discipline, eliminate the waste, and improve the quality of the product and others. There are some limitation of applying the lean methodology such as setup cost, cooperation within the administrator and operator and the company rules and policy. By applying the lean tools, the problem can be minimized and gain the high profit at the same time. The lean tools only can be suggested without implementation because of the rules and policy of the company.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TS155 .S56 2008 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000038766
Final Year Report Final Year Report UMPLIB PEKAN CD 3581 | TS155 .S56 2008 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000038767

Project paper (Bachelor of Mechanical Engineering with Automotive) -- Universiti Malaysia Pahang - 2008

The purpose of this project is to analyze the implementing of the lean methodology to low volume car production. There are many problem occurs at the production line such as breakdown of the machine. The project has started with identifying problem at the AMM plant focus at the Trim and Finale Department. Then, the data has been analyzed by using Total Quality Management Tools such as fishbone diagram and Pareto chart. From the analysis, the main problem is come from two type of the machine which is the mount lift and overhead pulley. The losses will affect the losses to the company. Some lean tools are suggested to overcome the problems which are Total Productive Maintenance (TPM), Standardized Work, Continuous Improvement, 5S and others. There are the advantages of applying lean methodology to the car production such as increase worker’s discipline, eliminate the waste, and improve the quality of the product and others. There are some limitation of applying the lean methodology such as setup cost, cooperation within the administrator and operator and the company rules and policy. By applying the lean tools, the problem can be minimized and gain the high profit at the same time. The lean tools only can be suggested without implementation because of the rules and policy of the company.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us