Improvement of boiling process in fish cracker production / Mohamad Nafis Jamaluddin

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2013Description: xiv, 45 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0006258(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013 Abstract: Boiling process is performed at the final stage in fish cracker processing. Long process time of boiling create bottleneck that limits daily production of fish cracker. Traditionally, the heat is produce to boil water is by burning fire woods. The invention of diesel-fired boiler has improved the process but still there are some problem occurs at the station. Therefore, a new boiler is designed to improve the boiling process by using LPG burner which has 2.9 % higher calorific value than diesel. The boiler designed must be simulated to study the heat convection inside the boiler by using SolidWorks Flow Simulation to see the temperature distribution inside the new boiler. Multiple layers bottom plate of the boiler consist of an aluminium plate sandwiched between two stainless steel plates is used to increase the rate of heat transfer from the flame into the water inside the boiler. The result from the simulation proves that the multiple layers bottom plate of the boiler has a higher rate of heat transfer than the single layer plate where the time taken for water to boil is 42.2 % shorter than the single stainless steel layer bottom plate boiler.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TJ263.5 .N34 2013 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000086424
Final Year Report Final Year Report UMPLIB PEKAN CD 8152 | TJ263.5 .N34 2013 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000086425

Project Paper (Bachelors of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013

Bibliography : p. 33-34

Boiling process is performed at the final stage in fish cracker processing. Long process time of boiling create bottleneck that limits daily production of fish cracker. Traditionally, the heat is produce to boil water is by burning fire woods. The invention of diesel-fired boiler has improved the process but still there are some problem occurs at the station. Therefore, a new boiler is designed to improve the boiling process by using LPG burner which has 2.9 % higher calorific value than diesel. The boiler designed must be simulated to study the heat convection inside the boiler by using SolidWorks Flow Simulation to see the temperature distribution inside the new boiler. Multiple layers bottom plate of the boiler consist of an aluminium plate sandwiched between two stainless steel plates is used to increase the rate of heat transfer from the flame into the water inside the boiler. The result from the simulation proves that the multiple layers bottom plate of the boiler has a higher rate of heat transfer than the single layer plate where the time taken for water to boil is 42.2 % shorter than the single stainless steel layer bottom plate boiler.