Evaluation on the performance of a signalized intersections / Nor Ain Nadia Binti Mohamad Zaid

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2017Description: xiv, 83 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0000589(Local)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 Abstract: Intersection is where the vehicle from other direction meet. If the number of vehicle increase, this will cause a worst traffic flow when need to change the lane or direction during driving. Nowadays, traffic flow is the common problem occur not only in the urban but also in rural area due to the increases of vehicle. Therefore, this study is intended to evaluate the performance of a signalized intersection during weekdays and weekend in terms of level of service (LOS) at the intersection. In order to achieve this, the T- signalized intersection that located at Batu 10, Jalan Gambang have been chosen as study area. The data collection will be recorded in several days during peak hour morning and evening on weekdays and weekend by manual count. Determination of traffic volume and geometric characteristic will figure out the delays and level of service (LOS). Based on the analyses, the cycle length and insufficient of lane cause the condition of this study area become worst. In order to improve the future operating level of service (LOS) the improvement that have been proposed are reduce the cycle length and make some change in the geometrical design such as added the number of lanes for the critical lanes. The improvement of the level of the service for the whole intersection will improve the performance of the intersection.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG FKASA .N337 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000121045
Final Year Report Final Year Report UMPLIB GAMBANG CD 11081 | FKASA .N337 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000121046

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017

Bibliography : p. 57-58

Intersection is where the vehicle from other direction meet. If the number of vehicle increase, this will cause a worst traffic flow when need to change the lane or direction during driving. Nowadays, traffic flow is the common problem occur not only in the urban but also in rural area due to the increases of vehicle. Therefore, this study is intended to evaluate the performance of a signalized intersection during weekdays and weekend in terms of level of service (LOS) at the intersection. In order to achieve this, the T- signalized intersection that located at Batu 10, Jalan Gambang have been chosen as study area. The data collection will be recorded in several days during peak hour morning and evening on weekdays and weekend by manual count. Determination of traffic volume and geometric characteristic will figure out the delays and level of service (LOS). Based on the analyses, the cycle length and insufficient of lane cause the condition of this study area become worst. In order to improve the future operating level of service (LOS) the improvement that have been proposed are reduce the cycle length and make some change in the geometrical design such as added the number of lanes for the critical lanes. The improvement of the level of the service for the whole intersection will improve the performance of the intersection.