Multidiscipline BIM modelling for administration, library, and academic centre (mechanical & electrical model) / Muhamad Syamim Alias

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2017Description: x, 50 p. : ill. (some col.), charts ; 30 cm. + 1 CD-ROMISBN:
  • THE0007893(Local)
Other title:
  • Multidiscipline BIM modelling for administration, library, and academic centre (mechanical and electrical model)
Subject(s): Dissertation note: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017 Abstract: Loss of information and miscommunication in the construction industry are often being related to project completion delays and low quality final products. Therefore, with the advancement of Information Technology, these problems can be reduced by implementing Building information modelling (BIM) approach in the construction industry. Autodesk Revit structure has the BIM feature implemented in the software, which allows information within an interface to be shared by construction players. In addition, by using 3D building model we can clearly visualise the entire project because project visualisation using traditional method normally can lead to misunderstanding problem and conflict between construction players. Aim of this research is to determine whether using BIM model can improve project visualization and collaboration between parties throughout the construction phase in Malaysia. To achieve the aim, 3D model focusing on mechanical and electrical d iscipline was created by using Revit software. From the study, the conflict occur during the construction process can be minimized by using BIM technology. In addition, the time required for completion of the project using BIM is verified and have been compared to conventional method. Lastly, the drafting process using BIM is compared to the conventional method and the result was verified. The accuracy of the model combined with animations and fly- through allow contractors to access the design layout before the build takes place and make alterations.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Thesis Thesis UMPLIB GAMBANG Reference FKASA .S936 2017 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000120842
Thesis Thesis UMPLIB GAMBANG CD 10967 | FKASA .S936 2017 r Bc. (Browse shelf(Opens below)) 1 In Transit 0000120843

Faculty of Civil Engineering and Earth Resources

Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017

Bibliography : p. 44-46

Loss of information and miscommunication in the construction industry are often being related to project completion delays and low quality final products. Therefore, with the advancement of Information Technology, these problems can be reduced by implementing Building information modelling (BIM) approach in the construction industry. Autodesk Revit structure has the BIM feature implemented in the software, which allows information within an interface to be shared by construction players. In addition, by using 3D building model we can clearly visualise the entire project because project visualisation using traditional method normally can lead to misunderstanding problem and conflict between construction players. Aim of this research is to determine whether using BIM model can improve project visualization and collaboration between parties throughout the construction phase in Malaysia. To achieve the aim, 3D model focusing on mechanical and electrical d iscipline was created by using Revit software. From the study, the conflict occur during the construction process can be minimized by using BIM technology. In addition, the time required for completion of the project using BIM is verified and have been compared to conventional method. Lastly, the drafting process using BIM is compared to the conventional method and the result was verified. The accuracy of the model combined with animations and fly- through allow contractors to access the design layout before the build takes place and make alterations.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us