Analyzing non-value added process at bi technologies corporation sdn. Bhd in order to improve plant layout for Hm72a-10 series (flat wire) model / Mazliani Ismail

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2013Description: xiv, 63 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0007641(Local)
  • THE0007796(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Engineering in Manufacturing) -- Universiti Malaysia Pahang – 2013 Abstract: This project presents a research to analyze Non-Value added process at BI Technologies Corporation Sdn. Bhd in order to improve its layout for HM72A-10 Series (Flat Wire) model. In this case study, distance travelled, cross flow, backtracking and its flow time in present layout was studied. The detailed studies of the layout such as operation process chart, flow of material and activity relationship chart have been investigated. The new layout have been designed and compared with the present layout. In addition, two alternative layouts were developed and evaluated by using non-value added process, flow of time and material handling distance as a criterion. The improved layouts could reduce the excessive movement 60.19% to 67.65% and the selected layout can reduce distance from 236.6 meters to 78.9 meters. As a result, the systematic layout planning pattern theory (SLP) showed that new layout significantly decrease the distance of material flow, cross flow and backtracking from receiving process until packaging.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TS178 . M39 2013 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000080346
Restricted Collection Restricted Collection UMPLIB PEKAN CD 7775 | TS178 . M39 2013 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000080347

Project paper (Bachelor of Engineering in Manufacturing) -- Universiti Malaysia Pahang – 2013

Bibliography : p. 61

This project presents a research to analyze Non-Value added process at BI Technologies Corporation Sdn. Bhd in order to improve its layout for HM72A-10 Series (Flat Wire) model. In this case study, distance travelled, cross flow, backtracking and its flow time in present layout was studied. The detailed studies of the layout such as operation process chart, flow of material and activity relationship chart have been investigated. The new layout have been designed and compared with the present layout. In addition, two alternative layouts were developed and evaluated by using non-value added process, flow of time and material handling distance as a criterion. The improved layouts could reduce the excessive movement 60.19% to 67.65% and the selected layout can reduce distance from 236.6 meters to 78.9 meters. As a result, the systematic layout planning pattern theory (SLP) showed that new layout significantly decrease the distance of material flow, cross flow and backtracking from receiving process until packaging.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us